Reference

FAQ

Short answers to the questions vendors ask most often before and during onboarding.

Taking part

How do we join? Register interest. Qvest reviews each registration and sends an invitation to the organisations it admits.

Can we submit before we have everything? Yes. Submit as soon as an image exists. Intake works out what it can and asks for the rest. See Organisational requirements.

We have no Helm chart. Is that a problem? No. A docker-compose file or Kubernetes manifests work too, and without either, Qvest drafts the deployment from your images and documents.

Our product is not a container. Can it take part? Not today. The programme accepts products delivered as container images.

Our product installs CRDs or a DaemonSet. That makes it a platform product, which takes part only by separate agreement with Qvest.

Running on the cluster

Our product needs root, privileged mode or host networking. It cannot run on the shared cluster; there is no exception. GPUs, hugepages and RDMA are requested as device resources instead. See Technical requirements.

Which CPU architecture do we need? linux/amd64.

Can we use kubectl? Yes, with your portal sign-in. You can read your own namespaces; engineers can also port-forward and exec in your sandboxes and bring-up runs. You cannot read Secrets or create workloads.

Can we see our product's metrics and logs? Yes, in your own Grafana organisation, which sees only your namespaces.

How long does a sandbox run? Until you stop it, or 8 hours after the last deploy, run or kubectl request by your team.

Our product needs a database. Use the platform's PostgreSQL operator, or ship the data store in your chart under the same rules as any workload. See Technical requirements.

Licences

Our licence is bound to a MAC address or a dongle. That is not accepted: runs start on new nodes every time. A licence bound to a node name, an instance UUID or a cluster ID works, and Qvest supplies a stable value. See Licensing.

Our licence server runs at our site. That works if it is reachable over the internet and allows the programme's egress addresses, which the portal shows.

Our licence has to be entered in the UI. Accepted, but the product cannot run unattended and reaches L3 only after a witnessed session.

Results and privacy

Who sees our results? Your organisation and Qvest staff. In an interop run, the other participants see only pass or fail per check, under an alias. Nothing is public until your admins or a Qvest admin publish it.

Can other vendors see our product? Only if your admins offer it for interop. Other vendors then see your organisation's name, the product's name and description, and its integrated versions.

Can other vendors reach our workloads on the shared cluster? Only through the interaction points you declare: ports your product offers to other products, such as an API. In a run, the other participating products may talk to yours through them and through nothing else. Every other port stays closed to other vendors, and a sandbox is reached by no other vendor. See Isolation architecture.

Can our product talk to another vendor's product? In a run, through that product's declared interaction points only. Using them is optional; the validation tracks do not depend on them.

Do you use AI on our material? Qvest's integration agents read your images, documents and messages to integrate the product. They run outside the platform, work on one of your work items at a time, and change the catalog only through a pull request that is reviewed, and accepted by a Qvest staff member, before it is merged. See Agentic workflows.

Can our own agents use the platform? Yes, through the same API as the portal, in a team member's name and with that member's rights.

What happens to our data when we leave the programme? Your organisation is offboarded: every object the platform holds for it is removed. Signed badge records stay, and the audit log keeps its pseudonymous entries.

Badges

Who decides on a badge? Two Qvest validators, from the evidence of runs the platform executed. See Validation passes.

What happens to a badge when we release a new version? If the version changes only images, the suites run again and the badge covers it once they pass. Validated badges need new interop runs.

Can we take our badges offline? Yes. Your admins turn publication off at any time; the signed records are kept and come back when publication is turned on again.